Grid Raven
- Software Provider
- Grid Infrastructures - Electricity
- Digitalisation
- Energy Efficiency
Boost your grid by 30%, now.
Cover all voltage levels from 30 kV to 765 kV with sensorless Dynamic Line Ratings. Say no to hardware.
GridRaven employs machine learnings to determine the actual conditions of all power lines.
Building a new high-voltage line takes 10 years on average.
The slow pace of building new power lines is the biggest obstacle on the path towards energy abundance. But the existing grid is not yet used to its maximum potential.
A light wind of 2 m/s increases throughput by 30%
Your existing grid can handle 30% more power on average with GridRaven's fully sensorless Dynamic Line Ratings. We are ready to help you do so right away. Fast-track the connection of new generation, reduce curtailment, sell more power and bring down the cost of energy.
Country
Contact Exhibitor
-
Pre-print of our IEEE article on sensorless DLR (currently on Arxiv as of 27.06.2024)
-
Introductory brochure.